国产亚洲欧美日韩在线爱豆|在线观看性生活|在线看片网站,国产美女毛片,久久日韩国产精品免费,亚洲国产日韩精品二三四区竹菊

酷爾科技
Quality control
According to the current situation of the company and ODM/OEM business characteristics, improve and establish the core management and control process.
Programme phase:Define the process requirements of new product quality control and the output requirements of each process node.
Design phase:Evaluate the early output evaluation test scheme and the first batch of inspection control scheme.
Trial production stage:Establish qualification requirements for new products to put an end to category An and B problems leading to the next node.
Mass production stage:Front-end management and control of product compliance risks (certification, water batches, packages).
Output requirements of each process node in ◆ new product design and development
① process guarantee
Industry advantage
Contact us
Mobile: +86-13527198413
WhatsApp:+86-13527198413
描述
◆ new product quality control process requirements
Confirmation of the first prototype and launch qualification of the new product of ◆
Advance output Test Scheme and process Control Scheme of ◆ New products
Aging Scheme and Aging data Analysis of the first batch of key and important New products of ◆
◆ establishes standardized guidelines for compliance for front-end management and control of new products
Evaluation Test Assurance:The company has established a professional laboratory of water household appliances and equipped with professional testers; the evaluation and test items include: blasting, secondary, pressure resistance, environmental resistance (temperature, humidity), key parameters of water quality indicators (turbidity, residual chlorine, oxygen consumption, desalination rate, microorganisms, etc.) and packaging, transportation, etc.
② hardware guarantee
  • Digestion instrument

  • PH acid-base meter

  • Digital display vibrating screen

  • Conductometer

Mold development guarantee:The company has excellent equipment and strong technology, and can design, manufacture and produce plastic moulds by itself.
③ hardware guarantee
  • Spark machine

  • Slow-walking thread cutting machine

  • CNC

Market service guarantee:Quality to set up an independent after-sales service team, equipped with professional technical support engineers corresponding market complaints, the establishment of customer complaint management methods and customer complaint handling process. In view of the market complaint problem, the external first time response and gives the treatment plan, the internal establishment improvement account, the deadline rectification, follow up the closed-loop management.
④ after-sales guarantee
Measures for the Administration of customer Complaints in ◆ Market
◆ market customers complain to improve the account
◆ market maintenance guidelines
Whole staff quality
Quality management commitment: 1, quality is the life of the enterprise; 2, quality is the starting point of our dignity and value; 3, to be quality is to be conscientious
10 minutes a day, review the process quality of the previous day, and check the production line quality every two hours.
Training and explaining matters needing attention before the launch of each new product prototype
Every month, the whole staff of the production line summarizes and reviews the implementation of self-inspection and mutual inspection.
主站蜘蛛池模板: 荔浦县| 中方县| 洛阳市| 大庆市| 汉阴县| 张家川| 奉化市| 武功县| 宜君县| 唐河县| 友谊县| 西和县| 穆棱市| 敦化市| 东至县| 金湖县| 洞头县| 乌恰县| 高陵县| 淳安县| 东至县| 中江县| 礼泉县| 洪泽县| 文登市| 罗城| 金乡县| 泽州县| 池州市| 武冈市| 巩留县| 安塞县| 沈丘县| 安乡县| 满城县| 中西区| 巴彦淖尔市| 锡林郭勒盟| 本溪| 太谷县| 沐川县|